A useful modular kitchen estimate starts with the cabinet work being built, not only the kitchen's floor area. The measured area, material, internal configuration, hardware and installation scope decide the price.
What the starting rate means
Svaara's kitchen joinery starts at ₹1,350 per sq ft for laminate-finish work with branded Indian hardware. GST is additional. This rate uses measured cabinet or finished joinery area.
PU, veneer, specialist surfaces, premium imported hardware, appliances, stone, civil changes and services are quoted separately where needed.
What shapes the quote
- Cabinet dimensions and layout.
- Tall units, lofts, drawers and internal accessories.
- Substrate and shutter finish.
- Hinges, channels and hardware.
- Delivery, installation and site protection.
- Stone, appliances, civil work and services, which need their own agreed scope.
Why two kitchen quotes can look far apart
One quote may include only carcass and shutters. Another may include internal accessories, premium hardware, site protection and installation. A third may quietly exclude stone, appliances, plumbing or electrical changes.
Ask for the same details in writing from every team. Compare measured area, material, finish, hardware, inclusions and exclusions before comparing totals.
How Svaara scopes a kitchen
Svaara measures the available space, discusses cooking and storage needs, confirms the specification, then issues a written estimate with inclusions and exclusions. Installation and site decisions follow that agreed scope.
Start with your kitchen
Share your kitchen's locality and the work you are considering. If you have dimensions or a floor plan, include them. Svaara will use the site and specification to prepare the next step.
Start your projectModular kitchen price questions
Questions people ask
Is the rate calculated on the kitchen's floor area?
No. Svaara uses measured cabinet or finished joinery area.
Does laminate-finish work include appliances?
No. Appliances, stone, civil changes and services are quoted separately where required.
Can the price change after measurement?
Yes, if the measured area, specification, site condition or exclusions change. The written proposal should show each revision clearly.
